Performing zero downtime database migrations

Étienne Lafarge

Context

On a modern deployment of a given backend service, one would like to have that service always available, even during deployments. Different rollout strategies have been developped for that purpose (blue/green deployments, progressive rollouts such as in Kubernetes...) and if you're reading this article, you porbably already have something like that set up... but, you also know for sure that there's an edge case that's not easy to handle: deploying a database migration without downtime.

Indeed, deploying an application on a higly available cluster requires one thing: two different versions of your application must run at the same time, not just two different instances. As a matter of fact, running multiple instances of one application implies one thing: you're storing your application's state outside of the application itself, thereby outsourcing the issue of sharding the state (or just not sharding it at all...) to another service, usually a database.

But what if you need to fundamentally alter that state so that the new version of your application - call it v2 - couldn't run alongside the old one (v1) ? You'd need to shutdown v1 before migrating and deploying v2 which means downtime.

However, this deadlock can be avoided in most cases. First of all, not all migrations would trigger v1 and v2 to be incompatible, actually, most migrations you perform probably are backwards-compatible, especially if you followed good database design practices from scracth. Furthermore, in the (hopefully rare) cases where you would have to perform a backwards-incompatible migration it can almost always be peformed in a backward-compatible way by splitting the backward-incompatible migrations in several backward-compatible migrations.

Avoiding backwards incompatible migrations

Let's take the simple example of renaming a field a to b. Running v1, that requires the presence of field a, and v2 that needs b is obviously impossible. Renaming a field is therefore a backward-incompatible migration, as well as changing its type (but not its description...).

As it appears, migrations aren't equal when it comes to backward-compatibility. adding a field isn't though, and that's probably what you'll mostly do as your application grows.

Deleting a field is backward incompatible but can be split into two operations. First of all removing the field only in the code and deploy the app. Then, probably during another deployment of the project as part of your CI pipeline, delete the field in the database itself.

Using Django for instance, this would be fairly simple:

  • first, delete the field in your model (and everywhere else in the code), then deploy.
  • once the deployment is done, run python manage.py makemigrations to generate your migration files, commit them and deploy (drop the field)

As we can see, most common migration cases can be handled in a fairly easy way, keeping backward-compatibility, and therefore high availability, all along the process. Only the case of updates is trickier but can be avoided by choosing good properties for fields from start. Even better, our widely-used ORMs are usually tend towards doing that by themselves.

What if want to run that field update ?

Updating as we said, is totally backwards-incompatible, but it's possible to split it into three backward-compatible steps. As you'll see, it might not be as obvious as it may feel in the first place.

For simplicity's sake, we'll take the example of renaming a field from a (used by v1) to b (used by v2).

Step 1: Deploy a v2.alpha version that create b and writes in it

no downtime database update step 1

The v2.alpha commit includes both a migration and code changes:

  • a migration that create the b field
  • code that reads from a (b isn't populated yet), writes to a (v1 requires that) and writes to b as well (we'll explain why in the next step).

Step 2: Copy all values from a to b

no downtime database update step 2

With v2.alpha writing to b, we can therefore be sure that b contains an up-to-date version of all the data (which wouldn't have been the case if we weren't already writing to b at the beginning of the copy: some elements could have been changed in a after being copied to b).

Step 3: b is functional, let's also read from it (but don't drop a!)

no downtime database update step 3

This deployment of v2 reads and write from b, but it must not contain the migration that deletes a, otherwise, all v1.alpha will stop working at once, before v2 actually started and some downtime will occur (see "worst case migration deployment")

Step 4: Ok, no-one needs a anymore, let's delete the field !

no downtime database update step 4

And we finally released v2 to prod !

In total, assuming a migration is "a commit of a migration file in your project's version-control system", it boils down to 4 commits (one per step) instead of one... so yeah, choose good names from start :)

Worst case migration deployment (if the CI & CD pipelines do their job)

If the CI pipeline does its jobs, a migration that makes v2 fail will never be deployed (Unit Tests and possibly Integration Tests will fail), so v2 should work (we can ensure it does or refuses to start with post-migration tests as detailed below). When it hits the production environment (during CD) it runs the migrations and breaks v1, but then starts, which hopefully shouldn't take long (I hope you didn't create an index in that migration...). We've had at most a few seconds of downtime.

At scale, this isn't that easy though: if you had 100 instances of v1 running and rolls out new instances one by one (like Kubernetes does by default), only one instance of v2 will be available when all v1s die... v2 won't hold for long and DevOps guys will have to force-deploy v2 (or roll back the migrations and have v1s work again).

But for a worst case scenario... it could be much worse :)

Collateral benefits

  • At each start of the application, we can attempt to apply migrations if they exist, which means no migration logic has to be handled in the Continuous Deployment pipeline.
  • The moment after migrations have been run and before the backend really starts is a good moment to run some integration tests (such as creating an instance of a model and playing with it for every model in the app, which should be doable even without an ORM and see if exceptions are thrown). If these fail, it's easier to revert the migrations we just applied (we probably still have a record of what they were in that piece of code). Also if there are several migrations and one fails in the middle, it's a good place to roll them all back. At the CI/CD level we should stop the deployment (Kubernetes does this out of the box for instance, and any decent Continous Deployment pipeline should already have implemented some similar logic otherwise).