Skip to content

added back json logging #10070

added back json logging

added back json logging #10070

Triggered via push January 5, 2025 13:17
Status Cancelled
Total duration 2m 15s
Artifacts 4

ci.yml

on: push
test  /  Golang Unit Tests
1m 37s
test / Golang Unit Tests
test  /  Golang Integration Tests
1m 37s
test / Golang Integration Tests
All required checks done
0s
All required checks done
Fit to window
Zoom out
Zoom in

Annotations

20 errors and 1 warning
lint / Lint Go: internal/common/armadacontext/armada_context_test.go#L5
File is not `gofumpt`-ed (gofumpt)
lint / Lint Go: internal/common/armadacontext/armada_context_test.go#L7
File is not `gofumpt`-ed (gofumpt)
lint / Lint Go: internal/common/armadacontext/armada_context_test.go#L8
File is not `goimports`-ed with -local github.com/armadaproject/armada (goimports)
lint / Lint Go: internal/common/logging/global.go#L3
File is not `gofumpt`-ed (gofumpt)
lint / Lint Go: internal/common/logging/global.go#L6
File is not `gofumpt`-ed (gofumpt)
lint / Lint Go: internal/common/logging/logger_test.go#L15
File is not `gofumpt`-ed (gofumpt)
lint / Lint Go: internal/common/logging/logger_test.go#L32
File is not `gofumpt`-ed (gofumpt)
lint / Lint Go: internal/common/startup.go#L134
File is not `gofumpt`-ed (gofumpt)
lint / Lint Go
issues found
test / TypeScript Unit Tests
Canceling since a higher priority waiting request for 'CI-refs/heads/f/chrisma/dual-log' exists
test / TypeScript Unit Tests
The operation was canceled.
test / Golang Integration Tests
Canceling since a higher priority waiting request for 'CI-refs/heads/f/chrisma/dual-log' exists
test / Golang Integration Tests
❌ No test results found for JUnit Test Report
test / Golang Integration Tests
The operation was canceled.
test / Golang Integration Tests
Process completed with exit code 1.
test / Golang Unit Tests
Canceling since a higher priority waiting request for 'CI-refs/heads/f/chrisma/dual-log' exists
test / Golang Unit Tests
❌ No test results found for JUnit Test Report
test / Golang Unit Tests
The operation was canceled.
build / prepare
Canceling since a higher priority waiting request for 'CI-refs/heads/f/chrisma/dual-log' exists
build / prepare
The operation was canceled.
build / pack-nuget
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
docker-compose-logs
319 Bytes
go-unit-test-reports
1.57 MB
nupkg-artifacts
386 KB
ts-unit-test-reports
4.77 KB