Skip to content

build(deps): bump astral-sh/ruff-action from 1 to 2 #321

build(deps): bump astral-sh/ruff-action from 1 to 2

build(deps): bump astral-sh/ruff-action from 1 to 2 #321

Triggered via push December 2, 2024 02:42
Status Failure
Total duration 24s
Artifacts

build.yml

on: push
Matrix: test
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
test (3.12)
The process '/opt/hostedtoolcache/ruff/0.8.1/x86_64/ruff' failed with exit code 1
test (3.13)
The job was canceled because "_3_12" failed.
test (3.13)
The operation was canceled.
test (3.12)
Using latest version of uv because no version is provided