932389: UG Improvement for Managing Tasks in Blazor Gantt Chart Component #5383

Open
wants to merge 2 commits into
base: development
Choose a base branch
from
Open
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
84 changes: 76 additions & 8 deletions blazor/gantt-chart/adding-new-tasks.md
Original file line number Diff line number Diff line change
Expand Up @@ -13,7 +13,7 @@ Tasks can be dynamically added to the Gantt Chart project by enabling the [Gantt

## Toolbar

A row can be added to the Gantt Chart component from the toolbar while the `GanttEditSettings.AllowAdding` property is set to `true`. After clicking the toolbar add icon, you should provide the task information in the add dialog.
To add a new row in the Gantt Chart component using the toolbar, set the `GanttEditSettings.AllowAdding` property to `true` and enable the add icon in the toolbar. When the user clicks the `Add` icon in the toolbar, a dialog will be displayed, allowing them to provide task information.

```cshtml
@using Syncfusion.Blazor.Gantt
Expand Down Expand Up @@ -65,7 +65,15 @@ N> By default, a new row will be added to the top most row in the Gantt Chart co

## Context menu

A row can also be added above, below or child of the selected row by using context menu support. For this, you need to enable the property `EnableContextMenu`.
In the Gantt Chart component, you can add tasks above, below and child of a selected row using the context menu. To enable this functionality, set the `EnableContextMenu` property to true in the SfGantt component.

When you right-click on a row, the context menu displays an `Add` option. Clicking on this option reveals a sub-context menu with the following choices:

* **Above**: Adds a new task above the selected row.
* **Below**: Adds a new task below the selected row.
* **Child**: Adds a new task as a child of the selected row.

When you select one of these submenu item, a new task will be added to the Gantt chart.

```cshtml
@using Syncfusion.Blazor.Gantt
Expand Down Expand Up @@ -112,13 +120,16 @@ A row can also be added above, below or child of the selected row by using conte

## Using method

You can add rows to the Gantt Chart component dynamically using the [AddRecordAsync](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_AddRecordAsync__0_System_Nullable_System_Double__System_Nullable_Syncfusion_Blazor_Gantt_RowPosition__) method and you can define the add position of the default new record by using the `RowPosition` property. You can also pass the `RowIndex` as an additional parameter.
You can add rows to the Gantt Chart component dynamically or externally using the [AddRecordAsync](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_AddRecordAsync__0_System_Nullable_System_Double__System_Nullable_Syncfusion_Blazor_Gantt_RowPosition__) method and you can define the add position of the default new record by using the `RowPosition` property. You can also pass the `RowIndex` as an additional parameter.

| **Row Position** | **Description** |
| --- | --- |
| `Top` | Adds the task to the top of the Gantt chart.|
| `Bottom` | Adds the task to the bottom of the Gantt chart.|
| `Above` | Adds the task above the selected row index.|
| `Below` | Adds the task below the selected row index.|
| `Child` | Adds the task as a child of the selected row index.|

* Top of all the rows.
* Bottom to all the existing rows.
* Above the selected row.
* Below the selected row.
* As child to the selected row.

```cshtml
@using Syncfusion.Blazor.Gantt
Expand Down Expand Up @@ -172,3 +183,60 @@ You can add rows to the Gantt Chart component dynamically using the [AddRecordAs
```

![Adding New Record in Blazor Gantt Chart](images/blazor-gantt-chart-add-new-record.png)

## Prevent adding new records using event

In the Gantt Chart component, the [RowUpdating](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.GanttEvents-1.html#Syncfusion_Blazor_Gantt_GanttEvents_1_RowUpdating%E2%80%AF) event is triggered before a save action is performed. To prevent the addition of a new record dynamically, you can set the [Cancel](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Grids.RowUpdatingEventArgs-1.html#Syncfusion_Blazor_Grids_RowUpdatingEventArgs_1_Cancel) property of the event argument to `true`.

```cshtml
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" Toolbar="@(new List<string>() { "Add"})">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" ParentID="ParentId">
</GanttTaskFields>
<GanttEditSettings AllowAdding="true" AllowEditing="true"></GanttEditSettings>
<GanttEvents TValue="TaskData" RowUpdating="RowUpdatingHandler"></GanttEvents>
</SfGantt>

@code{
public SfGantt<TaskData> Gantt;
private List<TaskData> TaskCollection { get; set; }

protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}

public void RowUpdatingHandler(GanttRowUpdatingEventArgs<TaskData> args)
{
args.Cancel = true;
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime? EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public int? ParentId { get; set; }
}

private static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>()
{
new TaskData() { TaskId = 1, TaskName = "Project initiation", StartDate = new DateTime(2022, 01, 04), EndDate = new DateTime(2022, 01, 23), },
new TaskData() { TaskId = 2, TaskName = "Identify Site location", StartDate = new DateTime(2022, 01, 04), Duration = "0", Progress = 30, ParentId = 1, },
new TaskData() { TaskId = 3, TaskName = "Perform soil test", StartDate = new DateTime(2022, 01, 04), Duration = "4", Progress = 40, ParentId = 1, },
new TaskData() { TaskId = 4, TaskName = "Soil test approval", StartDate = new DateTime(2022, 01, 04), Duration = "0", Progress = 30, ParentId = 1, },
new TaskData() { TaskId = 5, TaskName = "Project estimation", StartDate = new DateTime(2022, 01, 04), EndDate = new DateTime(2022, 01, 23), },
new TaskData() { TaskId = 6, TaskName = "Develop floor plan for estimation", StartDate = new DateTime(2022, 01, 06), Duration = "3", Progress = 30, ParentId = 5, },
new TaskData() { TaskId = 7, TaskName = "List materials", StartDate = new DateTime(2022, 01, 06), Duration = "3", Progress = 40, ParentId = 5, },
new TaskData() { TaskId = 8, TaskName = "Estimation approval", StartDate = new DateTime(2022, 01, 06), Duration = "0", Progress = 30, ParentId = 5, }
};
return Tasks;
}
}
```
105 changes: 103 additions & 2 deletions blazor/gantt-chart/deleting-tasks.md
Original file line number Diff line number Diff line change
Expand Up @@ -9,9 +9,110 @@ documentation: ug

# Deleting Tasks in Blazor Gantt Chart Component

## Deleting Tasks
This feature enables task deletion from the Gantt Chart project by setting the [GanttEditSettings.AllowDeleting](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.GanttEditSettings.html#Syncfusion_Blazor_Gantt_GanttEditSettings_AllowDeleting) property to `true`. It helps maintain an accurate and up-to-date project schedule by allowing tasks to be removed from the Gantt Chart.

A task delete option in the Gantt Chart component can be enabled by enabling the [GanttEditSettings.AllowDeleting](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.GanttEditSettings.html#Syncfusion_Blazor_Gantt_GanttEditSettings_AllowDeleting) property. Tasks can be deleted by clicking the delete toolbar item or using the `[DeleteRecordAsync](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_DeleteRecordAsync_System_Nullable_System_Int32__) method. You can call this method dynamically on any custom actions like button click. The following code example shows how to enable the delete option in the Gantt Chart component.
## Toolbar

To delete tasks in the Blazor Gantt Chart component, enable the `GanttEditSettings.AllowDeleting` property and add the delete icon to the toolbar. Clicking the delete icon in the toolbar will delete the selected tasks from the Gantt Chart.

```cshtml
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Toolbar="@(new List<string>() { "Add" })" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate" Duration="Duration" Progress="Progress" ParentID="ParentId">
</GanttTaskFields>
<GanttEditSettings AllowDeleting="true"></GanttEditSettings>
</SfGantt>

@code{
private List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}

public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime? EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public int? ParentId { get; set; }
}

public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>()
{
new TaskData() { TaskId = 1, TaskName = "Project initiation", StartDate = new DateTime(2022, 04, 05), EndDate = new DateTime(2022, 04, 21), },
new TaskData() { TaskId = 2, TaskName = "Identify Site location", StartDate = new DateTime(2022, 04, 05), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 3, TaskName = "Perform soil test", StartDate = new DateTime(2022, 04, 05), Duration = "4", Progress = 40, ParentId = 1 },
new TaskData() { TaskId = 4, TaskName = "Soil test approval", StartDate = new DateTime(2022, 04, 05), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 5, TaskName = "Project estimation", StartDate = new DateTime(2022, 04, 06), EndDate = new DateTime(2022, 04, 21), },
new TaskData() { TaskId = 6, TaskName = "Develop floor plan for estimation", StartDate = new DateTime(2022, 04, 06), Duration = "3", Progress = 30, ParentId = 5 },
new TaskData() { TaskId = 7, TaskName = "List materials", StartDate = new DateTime(2022, 04, 06), Duration = "3", Progress = 40, ParentId = 5 },
new TaskData() { TaskId = 8, TaskName = "Estimation approval", StartDate = new DateTime(2022, 04, 06), Duration = "0", Progress = 30, ParentId = 5 }
};
return Tasks;
}
}
```

## Context menu

In the Blazor Gantt Chart component, you can delete tasks using the context menu. To enable this functionality, set the `EnableContextMenu` property to true in the SfGantt component.

When you right-click on a row, the context menu displays a `Delete Task` option. Clicking on this option will delete the selected row from the Gantt Chart.

```cshtml
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" EnableContextMenu="true" Width="900px" HighlightWeekends="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate" Duration="Duration" Progress="Progress"
Dependency="Predecessor" ParentID="ParentId"></GanttTaskFields>
<GanttEditSettings AllowDeleting="true"></GanttEditSettings>
</SfGantt>

@code{
private List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime? EndDate { get; set; }
public string Duration { get; set; }
public double Progress { get; set; }
public string Predecessor { get; set; }
public int? ParentId { get; set; }
}

public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() { TaskId = 1, TaskName = "Project initiation", StartDate = new DateTime(2022, 04, 05), EndDate = new DateTime(2022, 04, 21) },
new TaskData() { TaskId = 2, TaskName = "Identify Site location", StartDate = new DateTime(2022, 04, 05), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 3, TaskName = "Perform soil test", StartDate = new DateTime(2022, 04, 05), Duration = "4", Progress = 40, ParentId = 1 },
new TaskData() { TaskId = 4, TaskName = "Soil test approval", StartDate = new DateTime(2022, 04, 05), Duration = "3", Progress = 30, Predecessor = "2", ParentId = 1 },
new TaskData() { TaskId = 5, TaskName = "Project estimation", StartDate = new DateTime(2022, 04, 06), EndDate = new DateTime(2022, 04, 21) },
new TaskData() { TaskId = 6, TaskName = "Develop floor plan for estimation", StartDate = new DateTime(2022, 04, 06), Duration = "3", Progress = 30, ParentId = 5 },
new TaskData() { TaskId = 7, TaskName = "List materials", StartDate = new DateTime(2022, 04, 06), Duration = "3", Progress = 40, ParentId = 5 },
new TaskData() { TaskId = 8, TaskName = "Estimation approval", StartDate = new DateTime(2022, 04, 06), Duration = "0", Progress = 30, Predecessor = "6", ParentId = 5 }
};
return Tasks;
}
}
```

## Using method

To delete tasks dynamically or externally in the Blazor Gantt Chart component, you can use the [DeleteRecordAsync](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_DeleteRecordAsync_System_Nullable_System_Int32__) method. This method allows you to programmatically delete a specific task

The following code example shows how to enable the delete option in the Gantt Chart component.

```cshtml
@using Syncfusion.Blazor.Gantt
Expand Down
Loading