-
Notifications
You must be signed in to change notification settings - Fork 0
Requirements
The key points outlined below show high level requirements for the project that can be futher broken down into sub-requirements.
-
Personnel Tracking
The tracking and the monitoring of personnel must be prioritised. Furthermore, their locations must be accessible in real time by relevant site supervisors for safety purposes. -
Equipment Tracking
The system should also be attachable to larger pieces of equipment which allows tracking of said equipments. This will lead to improvements in efficiency and management of an oil rig. -
Asset Location Analysis
The system will provide analysis tools for data collection. For example, the system should be able to provide information on patterns detected for activities such as:
* Personnel Movement
* Equipment Movement
* Safety Hazards
This information will then be used to improve efficiency and safety in an oil rig. -
Seawater Detection
The system should detect if any personnel has fallen off the oil rig into the ocean.