05.Iteration 5 [Statistics production]
It was made by María Blanco González-Mohíno and Mario Martín Alonso, the requirements for this part of the project are:
Number | Requirements |
---|---|
1 | Average time of delivery of the note. |
2 | Average preparation time so that the table is free. |
3 | Average meal preparation time. |
4 | Average time to take command. |
This part took us 1 hour.
It was made by María Blanco González-Mohíno and Mario Martín Alonso. The use cases diagrams, where they have one use case per requirement, created for this part are the following:
This part took us 30 minutes.
Adrián Ruiz Esteban and María Jesús Dueñas started the design of the implementation 5 the 19th of December and finished 19th December with no problems. We have made two sequence diagrams one to show the statistics as such and the other to establish the average of the times of the sequence of the tables.
This part took us three hours, so the time that was thought.
Mario Martin Alonso and María Jesús Dueñas Recuero carried out the implementation of this iteration between 19th December and 20th December 2020. It was carried out in two days where the first day the code was made regarding the domain with the classes control of statistics and statistics. And the next day was finished with the implementation and the statistics interface.
Adrián Ruiz Esteban and Celia Díaz Fernández developed the testing part of the iteration 3. At the begginning we thought that it would take us less but eventually we found some mistakes in the implemetation of one of the methods so we had to wait approximately an hour until it was ready and then continue with the testing. At the end we exceeded a bit the time we had in the planification.